Skip to assembly guide
From the box
One step
Floor display assembly
Prepared by Execuprint
Vallarta floor display · 117874
From the box
to the floor.
Follow along as you assemble your display. Choose a video below, press Play, and pause whenever you need. Complete each step before moving on.
Introduction
Video 1 of 9See the display before you begin. Select a step, press Play, and pause whenever you need to.
Player not loading? Open this clip on Vimeo
Choose a video step 9 videos · Start with the introduction
- 00 Introduction
- 01 Open the tower
- 02 Connect tower to base
- 03 Complete the base
- 04 The two-score fold
- 05 Top & middle shelves
- 06 Larger bottom shelves
- 07 Bread-side shelves
- 08 Opposite-side shelves
Before you begin
- 1 tower
- 1 base
- 6 shelves
- T supports
The written guide
One step
at a time.
Open any step for a quick reminder. Form and install the shelves, then attach the T supports last.
-
01 Open and square the tower
Unfold any shipping fold and open the tower. Square the body, fold the small top flaps inward, then close the long top flaps. Watch this step -
02 Connect the tower to the base
Turn the tower upside down. Fit the open base over the bottom tabs. Push the tabs through the slots, then fold them into the locking slits. Watch this step -
03 Complete the base
Turn the connected tower and base upright. Raise the base walls, tuck the corners, and fold the cover panels down. Seat the tabs so the base is square and supports the tower. Watch this step -
04 Learn the two-score shelf fold
Lay the shelf flat and locate both parallel score lines. Begin at the farther score, then slowly work toward the nearer score. Work evenly along the fold and let both lines flex. Review the folding reminder. Watch this step -
05 Form the top and middle shelves
Use the four smaller shelves for the top and middle positions—two for each side. Form the back, side walls, and front lip carefully. Seat the locking tabs. Keep the bread-side pieces separate from the opposite-side pieces, and leave rear tape liners on until installation. Watch this step -
06 Form the larger bottom shelves
Use the two larger shelves for the bottom positions—one on each side. Fold slowly using both score lines and engage each locking tab. The bottom shelves are 1½ inches deeper than the top and middle shelves. Watch this step -
07 Install the bread-side shelves
Match the shelf artwork to the bread side. Install the larger bottom shelf first, followed by the middle and top shelves. Remove the rear tape liners when ready to install. Tilt the shelf to align its rear connectors, insert them, and lower it into position. Seat the side connections and the lock underneath, then press the aligned tape joints firmly. Watch this step -
08 Install the opposite-side shelves
Repeat on the opposite side using its matching shelf pieces: larger bottom shelf first, then middle and top. Check every tab, slot, and underside lock. The display has three shelves on each side. Watch this step -
09 Attach the T supports last
After the shelves are installed, attach the T supports to each side of the base for additional support. Align each piece before removing its double-sided tape liner, then press the taped connection firmly.
One final check.
Before adding product, confirm each point.
Something not fitting?
Pause rather than force the piece. Send us your store number, display number 117874, and a photo of the area you’re working on.
